We are requesting a BIM Coordinator / Modeller role to maintain the Shaft and headhouse live. This role is critical to ensure the continuous update and coordination of the design model, integrating field changes, as-built records, and supplier inputs in accordance with the client.
The client is constructing 13 miles of twin-bore tunnels on a major route to its southern terminus at Euston. The tunnels are built using 7 state-of-the-art tunnel boring machines (TBMs), one was used to construct the logistics tunnel.
The tunnels are built using different construction techniques to suit their purpose and local conditions. A green tunnel is where a trench is excavated and roofed over, and the land on top is blended into the landscape. A twin-bore tunnel is where two parallel tunnels, each containing a single rail track, are constructed using tunnel boring machines (TBMs).
We offer a stimulating work environment with enthusiastic, intelligent, hard-working colleagues, and support personal development through training and project opportunities. Our principal office is in London, with other offices in Manchester.
MNCJobs.co.uk will not be responsible for any payment made to a third-party. All Terms of Use are applicable.