HS2 is Great Britain's new high-speed railway. Once operational, HS2's British-built bullet trains will provide zero-carbon journeys between the UK's two largest cities, Birmingham and London.
By better connecting Britain's biggest economic centres and catalysing plans for inner-city regeneration, HS2 will open opportunities for the creation of thousands of new jobs and homes as well as driving transformative economic growth.
Comprising 140-miles of track, four new state-of-the art stations, two depots, 32 miles of tunnel, and 130 bridges, HS2 will leave a legacy of environmentally responsible travel, economic regeneration and technological innovation for generations to come.
HS2 Rail Systems Package 2 involves the design, supply, build, testing and commissioning of all tunnel and lineside M&E systems between London and Birmingham. Scope of works includes installation of tunnel ventilation, cable management, containment and earthing, fire suppression systems, LV distribution and tunnel lighting, cross passage doors, earthing & bonding, points heating, junction lighting and power installation. Costain will be prime contractor, delivering the works with the support of a design team and specialist supply chain partners.
You will be expected to work in accordance with the HS2 M&E Costain+ Values and Behaviours:
MNCJobs.co.uk will not be responsible for any payment made to a third-party. All Terms of Use are applicable.